|
Who's Online
There currently are 5978 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
El producto satisface las necesidades del servicio t
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
PV-GS250PP
5 HOW TO REPLACE THE LITHIUM BATTERY (PROCEDURE)
1. Remove the Side Case (L) C.B.A.. (Refer to Disassembly Procedures.) 2. Unsolder the Lithium Battery �ML920S/F9D� and then replace the new one. (See Fig. B1.) 3. Danger of explosion if battery is incorrectly replaced. Replace only with the same or equivalent type.
Fig. B1
Note: The lithium battery is a critical component. (Type No.: N9ZZ00000297.) It must never be subjected to excessive heat or discharge. It must therefore only be fitted in equipment designed specifically for its use. Replacement batteries must be of the same type and manufacture. They must be fitted in the same manner and location as the original battery, with the correct polarity contacts observed. Do not attempt to re-charge the old battery or re-use it for any other purpose. It should be disposed of in waste products destined for burial rather than incineration.
10
|
|
|
> |
|