|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Great Service Manual, Very Complete, as advertised, Perfect, Thanks!
 ;
Good quality service manual.It has helped me to fix my FV1800,particularly for replacing the dial cord.The scheme is on A3 format and very readable.Thank.Olivier.
 ;
This manual is complete and very readable.It was a great help for my two ICF5800L.The first one had the dial cord broken,and without the service manual it is impossible to replace it.Thank.Olivier.
 ;
This is a top quality manual. You couldn't get better if you had the original and scanned it yourself. Best price on the net as well. Diagrams are clear and complete, text is sharp and easy to read. Granted you don't get the manual the second you click pay, but the few hours you have to wait for it to be available for download isn't a problem at all. This is a very reliable company.
Very VERY pleased with the product, and will buy others. Thanks!
 ;
In a word AWESOME.
I never expected the quality and abundant content that I got with this manual. Everything you'd ever want to know from a service perspective is found in this manual, along with... as a bonus, operating instructions on how to use the unit. WOW. Very impressed with the quality of the manual. You won't be disappointed if you're looking for the EVS900 service manual.
ADJUSTMENT OF TAPE TRANSPORTING SYSTEM
2) Pre-Adjustment of the Path (Adjustment of PG)
A. C onnect the Channel 1(CH 1) of the O scilloscope to TP01-3(Head Switching Pulse) and CH2 to the V IDEO OU T. And align the Tracking VR on the center. B. Playback the Stair-step Signal Tape(DN 2). C. Turn the PG Volum e and adjust the gap between the S witching signal and the V-S ync signal to be 6.5H0.5H .
Figure 5-5
3) linearity Adjustment
Connect the Channel 1(CH1) of the O scilloscope to the TP01-2(CTL Pulse) and CH2 to the TP01-4(Envelope Wave) and EXT. Trigger to the TP01-3(Switching P ulse). And then, playback the test tape in the SP M ode. 3-1) Adjustm ent of S & T side A. Adjust the Tracking VR to m axim ize the RF signal of the test tape. B. Make the entrance and exit side Envelope Wave same as Fig. 5-6 by adjusting the S/T-Guide Roller ( and of Fig. 5-1). 3-2) Rough Adjustm ent of the X-Position A. Turn the Tracking V R to align it on the center. B. Loosen the A /C Head Screws by turning about 90120.
Figure 5-6
Figure 5-7
30
|
|
 |
> |
|