|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
A great manual; it contained all the information I required and allowed me to restore the receiver to full working condition!
 ;
Very good expirience with owner-manuals.com.
5 Stars; In future if necessary, i´ll download manuals on this site.
 ;
Hi - happy with what I received but not quite what I wanted - my fault I assumed that service manual would also include operational instructions which is what I needed - all I needed to know was how to turn the radio - thanks
 ;
this Manual very important when i buy this Manual i already fix the trouble of my Camera..... thanks keep up the good work.!
 ;
This service manual helped me to repair my PIONEER. Iam very satisfied, that I found it here.
Even the price of manual was not so high that person would not be able to spend a few money.
But that is very worth spent money. Thanks
SA-HT680P / SA-HT680PC
12 Service Position
12.1. Checking, Repair AC Inlet P.C.B
· Follow the (Step 1) - (Step 2) of Item 10.3.
12.2. Checking, Repair FL P.C.B and Power BTN P.C.B.
· Follow the (Step 1) - (Step 2) of Item 10.3. · Follow the (Step 1) - (Step 4) of Item 10.4. · Follow the (Step 1) - (Step 3) of Item 10.11. Step 1 Connect FFC at connector (CN6900).
12.4. Checking, Repair DVD Module P.C.B.
· Follow the (Step 1) - (Step 2) of Item 10.3. · Follow the (Step 1) - (Step 4) of Item 10.4. · Follow the (Step 1) - (Step 4) of Item 10.6. · Follow the (Step 1) - (Step 3) of Item 10.11. · Follow the (Step 1) of Item 10.5. Step 1 Connect FFC at connector (CN6900). Step 2 Put the CR16D Mechanism Unit up position and checking or repair the DVD Module P.C.B.
12.3. Checking, Repair Main P.C.B., Power P.C.B, Regulator P.C.B.
· Follow the (Step 1) - (Step 2) of Item 10.3. · Follow the (Step 1) - (Step 4) of Item 10.4. · Follow the (Step 1) - (Step 4) of Item 10.6. · Follow the (Step 1) - (Step 3) of Item 10.11. · Follow the (Step 1), (Step 3) of Item 10.7. Step 1 Connect FFC at connector (CN6900). Step 2 Turn over main P.C.B. to position on CR16D Mechanism unit horizontally.
48
|
|
 |
> |
|