|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
- SPECIFICATIONS
- PROTECTION OF EYES FROM LASER BEAM DURING SERVICING
- PRECAUTION TO REPLACE OPTICAL BLOCK
- ELECTRICAL MAIN PARTS LIST
- TRANSISTOR ILLUSTRATION
- BLOCK DIAGRAM - 1 (MAIN/FRONT)
- BLOCK DIAGRAM - 2 (TUNER : HE, HR, HK)
- BLOCK DIAGRAM - 3 (TUNER : LH, U, G)
- BLOCK DIAGRAM - 4 (TUNER : E, K, Z)
- FL GRID ASSIGNMENT/ANODE CONNECTION
- WIRING - 1 (MAIN : HE, HR, HK)
- SCHEMATIC DIAGRAM - 1 (MAIN : HE, HR, HK)
- IC BLOCK DIAGRAM - 1
- WIRING - 2 (MAIN : LH, G)
- SCHEMATIC DIAGRAM - 2 (MAIN : LH, G)
- IC BLOCK DIAGRAM - 2
- WIRING - 3 (MAIN : E, K, Z)
- SCHEMATIC DIAGRAM - 3 (MAIN : E, K, Z)
- IC BLOCK DIAGRAM - 3
- WIRING - 4 (MAIN : U)
- SCHEMATIC DIAGRAM - 4 (MAIN : U)
- WIRING - 5 (FRONT)
- SCHEMATIC DIAGRAM - 5 (FRONT)
- WIRING - 6 (DECK )
- WIRING - 7 (PT)
- IC DESCRIPTION
- ADJUSTMENT - 1 < TUNER/DECK >
- PRACTICAL SERVICE FIGURE
- ADJUSTMENT - 2 < CD >
- MECHANICAL EXPLODED VIEW 1/1
- MECHANICAL PARTS LIST 1/1
- TAPE MECHANISM EXPLODED VIEW 1/1
- TAPE MECHANISM PARTS LIST 1/1
- SPRING APPLICATION POSITION
- SPEAKER EXPLODED VIEW 1/1
- SPEAKER PARTS LIST 1/1 (SX - FNV50)
- SPEAKER PARTS LIST (SX - NV30)
- ACCESSORIES/PACKAGE LIST
- REFERENCE NAME LIST
There are currently no product reviews.
 ;
The manual describes this product very good. It has the basic things to know and also a more detailed look. Very well made!
 ;
An excellent document to assist in the repair of my old personal tape player. It includes full circuit diagrams and physical layout drawings and full instructions on disassembly and fault finding.
Well worth the meagre price.
 ;
Very good conversation, Pretty fast Service, wood do it again,
Have paid by Paypal, so i got the Service Manual online after 15 Min.
Very helpfully.
Greeting from Germany,
Hans
 ;
Good-quality scans. Detailed description. I hope I can repair the machine.
 ;
High-quality scanning. Detailed description. Recommend for all technician. A+++
How to Adjust the Rotating Phase of the Gear, Main Cam
1) Push down the hooking catch of the CHAS. MECH, and remove the TRAY. 2) Align the arrow mark of the Gear, Main Cam with the black round mark of the CHAS, MECHA as shown below. 3) Confirm that the Slide, Mech Cam is located in the right position, then insert the TRAY gently. Caution: If the rotating phase of the Gear, Main Cam is incorrectly adjusted, the chucking operation and tray movement will have malfunction.
Align the arrow round mark.
mark with the black
4
|
|
 |
> |
|