|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Great Manual! It contains all the wiring schematics and mechanical exploded views that are essential for service and repair. I was surprised I even found this for such an old machine. Only wish I knew of this site many years ago.
 ;
Great manual very clear copied. You are making an incredible job. I appreciate a lot the rapidity and your efficiency. Thanks a lot
 ;
Good pdf of the service manual for this unit. Includes disassembly instructions, full schematics, board layouts, parts lists and diagnostic information. Some information is in the pdf twice (single pages, and split pages), but that could be how it was originally generated by panasonic, or perhaps the idea is to make it eaiser to put onto 8.5 x 11" pages.
Information was exactly what I needed. Delivery was overnight (less than 12 hours) and I was happy with the process.
 ;
5 STARS for FAST DELIVERY, BEST PRICES and QUALITY PRODUCT. Item was exactly as described with superb resolution. Will definitely source all my future requirements from this website. Thanks a lot owner-manual.com!
 ;
OEM manual provided all schematics, board layouts and component specs necessary to facilitate unit maintenance. All pages were clear and readable.
VC-SA597M VC-SH997M Note: Whenever replacing the reel disk, perform the height checking and adjustment.
Master plane Reel disk height adjusting jig Reel disk Mechanism chassis
Notes: 1. Hold the torque gauge by hand so that it is not moved. 2. Do not keep the reel disk in lock state. Do not allow longtime measurement.
10 ± 0.2mm
CHECKING AND ADJUSTMENT OF TAKE-UP TORQUE IN REWIND MODE
� Remove the cassette housing control assembly. � After short-circuiting TP801 provided at the right (facing to the main PWB), plug in the power cord. � Setting 1. Set a torque gauge to zero on the scale. Place it on the supply reel disk. 2. Press the rewind button. 3. To calculate the remaining capacity, slowly rotate the take-up reel disk, and then shift it into the rewind mode. � Checking 1. Turn the torque gauge slowly (one rotation every 2 to 3 seconds) by hand in the CCW direction. 2. Make sure that the indication of torque gauge is not less than 30mN·m (306gf·cm).
Torque gauge
A
Reel disk
B
Figure 4-7.
CHECKING AND ADJUSTMENT OF TAKE-UP TORQUE IN FAST FORWARD MODE
� Remove the cassette housing control assembly. � After short-circuiting TP801 provided at the right(facing to the main PWB), plug in the power cord. � Setting 1. Set a torque gauge to zero on the scale. Place it on the take-up reel disk. 2. Press the FF button. 3. To calculate the remaining capacity of the play back mode, slowly rotate the supply reel disk, and then shift it into the forward mode. � Checking 1. Turn the torque gauge slowly (one rotation every 2 to 3 seconds) by hand in the CW direction. 2. Make sure that the indication of torque gauge is not less than 30mN·m (306gf·cm).
Torque gauge
30mN·m (306gf·cm) or more CCW
The gauge is held at its maximum value. (Red mark)
Supply reel disk 30mN·m (306gf·cm) or more CW
The gauge is held at its maximum value. (Red mark)
Idler ass'y
Figure 4-9. � Adjustment 1. If the rewind winding-up torque is less than the specified value, clean the capstan D.D. motor pulley, drive belt, and limiter pulley with cleaning liquid, rewind again, and check the winding-up torque. 2. If the winding-up torque is still out of range, replace the drive belt.
Idler ass'y
Figure 4-8. � Adjustment 1. If the FF winding-up torque is less than the specified value, clean the capstan D.D. motor pulley, drive belt, and limiter pulley with cleaning liquid, and check again. 2. If the torque is less than the set value, replace the reel belt.
15
|
|
 |
> |
|