|
Who's Online
There currently are 6002 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Very good manual. Plenty of service information including alignment instructions. Clear circuit diagram. Excellent, thank you.
;
Good morning, the service manual you sent me was perfect.
Your service and answering are excellent.
I recomend this service.
Best regards.
;
I had been looking everywhere for a proper service manual for this VCR. Everywhere else that has this available for download has a very light version. This is the full service manual with all aspects that would interest anyone looking for the service manual for the AIWA HV-MX100 Worldwide VHS VCR. Great quality (as always). A winner hands down. Best Quality.
;
Top quality manual. Covers all aspects you'd expect in a top quality service manual for this Panasonic VHS VCR. The manual resolution is high. Another top quality manual from the only site worth downloading manuals from! If you're looking for a manual for the PV-9662 VHS VCR, this is the one you'll want to get!
;
complete part-lists and pcb layout, schematic diagram is good enlargable,
VC-V10/V19 VC-V30/V50 VC-V59/V70
Note: Whenever replacing the reel disk, perform the height checking and adjustment.
Master plane Reel disk height adjusting jig
Notes: 1. Hold the torque gauge by hand so that it is not moved. 2. Do not keep the reel disk in lock state. Do not allow longtime measurement.
10 ± 0.2mm
Reel disk
A
Mechanism chassis
4-7 CHECKING AND ADJUSTMENT OF TAKEUP TORQUE IN REWIND MODE
� Remove the cassette housing control assembly. � After short-circuiting TP701 provided at the center (facing to the main PWB), plug in the power cord. � Setting 1. Set a torque gauge to zero on the scale. Place it on the supply reel disk. 2. Press the rewind button. 3. To calculate the remaining capacity, slowly rotate the take-up reel disk, and then shift it into the rewind mode. � Checking 1. Turn the torque gauge slowly (one rotation every 2 to 3 seconds) by hand in the CCW direction. 2. Make sure that the indication of torque gauge is not less than 30mN·m (306gf·cm).
Torque gauge
B
Reel disk
Figure 4-7.
4-6 CHECKING AND ADJUSTMENT OF TAKEUP TORQUE IN FAST FORWARD MODE
� Remove the cassette housing control assembly. � After short-circuiting TP701 provided at the center (facing to the main PWB), plug in the power cord. � Setting 1. Set a torque gauge to zero on the scale. Place it on the take-up reel disk. 2. Press the FF button. 3. To calculate the remaining capacity of the play back mode, slowly rotate the supply reel disk, and then shift it into the forward mode. � Checking 1. Turn the torque gauge slowly (one rotation every 2 to 3 seconds) by hand in the CW direction. 2. Make sure that the indication of torque gauge is not less than 30mN·m (306gf·cm).
Torque gauge
30mN·m (306gf·cm) or more CCW
The gauge is held at its maximum value. (Red mark)
Supply reel disk 30mN·m (306gf·cm) or more CW
The gauge is held at its maximum value. (Red mark)
Idler ass'y
Figure 4-9. � Adjustment 1. If the rewind winding-up torque is less than the specified value, clean the capstan D.D. motor pulley, drive belt, and limiter pulley with cleaning liquid, rewind again, and check the winding-up torque. 2. If the winding-up torque is still out of range, replace the drive belt.
Idler ass'y
Figure 4-8. � Adjustment 1. If the FF winding-up torque is less than the specified value, clean the capstan D.D. motor pulley, drive belt, and limiter pulley with cleaning liquid, and check again. 2. If the torque is less than the set value, replace the reel belt.
12
|
|
|
> |
|