|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
Excellent quality service manual. Quick processing, fair prices. Love to do business again. Thank you!!!
 ;
Excellent service manual, the only known point of note is the alignment of improvability scanned pages within the pdf page. The resolution is good.
 ;
I was very glad recieving the service manal from You. Additionaly very fast. Extremaly nice servicing. Thanks very mach! Now my GX-220 working better, than it was made. Alexander from Moscow, Russia/
 ;
Sweet! I won the item on eBay and couldn't adjust the geometry or even keep a steady picure. This guide has the full schematics (not available anywhere else as far as I could tell), and was a bargain for the wealth of knowledge it contains. I hooked it up to my testing equipment, tweaked a few potentiometers and got it playing videogames in no time. Thanks!
 ;
It was just what I need to fix my old BMW's CD player. Very convenient also. Thank you.
VDR-D210P / VDR-D220P / VDR-D230P / VDR-D210PC / VDR-D220PC / VDR-D230PC
13. Installation of LCD Panel, Reflect Sheet, Lead Light Panel, Diffusion Sheet, BEF Sheet, BEF Sheet A and Panel Holder Unit a. When replacing the LCD Panel, the Diffusion Sheet, the BEF Sheet and the BEF Sheet A, make sure to remove the Protection Sheets. To distinguish Sheets from attached Protection Sheet: - A blue Protection Sheet is affixed to both faces of the Diffusion Sheet. - A green Protection Sheet is affixed to both faces of the BEF Sheet. - A green Protection Sheet is affixed to both faces of the BEF Sheet A.
Protection Sheet (blue) Diffusion Sheet
Reflect Sheet
Adhesive tape Lead Light Panel
Diffusion Sheet (white)
BEF Sheet
Protection Sheet (green) BEF Sheet
(stripe)
BEF Sheet A
Protection Sheet (green) BEF Sheet A
(stripe)
Panel Holder Unit Portion A Adhesive tape Portions B LCD Panel
b. Use extreme care when handling the LCD Panel, the Reflect Sheet, the Lead Light Panel, the Diffusion Sheet, the BEF Sheet and the BEF Sheet A to avoid damage, dust, and spots (especially fingerprints, etc.) Install in order shown below. 1) Install in order: the BEF Sheet A, BEF Sheet and Diffusion Sheet while fitting the corners of each sheet into the corners of the Panel Holder Unit. 2) Install the Lead Light Panel while fitting the corners into the corners of the Panel Holder Unit. 3) Place the Reflect Sheet so it is aligned with Portion A of the Panel Holder Unit, then install it using the adhesive tape portions of the Reflect Sheet.
Do not touch the surface of Lead Light Panel.
Adhesive tape
Fig. D13-2
Adhesive tape Adhesive tape
Reflect Sheet Panel Holder Unit
Fig. D13-1 4) Install the LCD Panel with adhesive tape so it is aligned with Portions B of the Panel Holder Unit.
32
|
|
 |
> |
|