|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Manual was just as described!!! I odered it and in less than a day was able to download it and the text was clear and pages were all complete just as the original manual was. Purcashed this for a friend and they were more than happy. Perfect all around!
 ;
Excellent service and prompt delivery. But it's not a manual - only 4 pages wiring diagrams.
Thanks.
 ;
The manual I purchased was exactly what I needed to repair my Toshica television. The manual contained schematics and troubleshooting information that was very helpful.
 ;
Il download del Service Manual JVC HR 4100 non é stato eseguito
 ;
The Service Manual was just as expected, complete with schematics and I was able to download it in less than an hour after I ordered it. The only problem with these is that the schematics are hard to read due to the small font. I could remedy this by printing them on a larger printer.
VL-NZ80S
7-4. Running rough adjustment
(With cassette controller) 1) Su, Tu guide roller height adjustment <Method and description> (1) Loosen the guide roller lock screw, then tighten loosely so that the roller turns easily. (2) Replay an alignment tape, and adjust the Sup, Tu guide roller so that the envelope sides of entrance and exit are flat. (3) Perform ± 1/4 shift, then, as in the above case, adjust until the envelope becomes flat. * If running is difficult for the entrance changed, turn the T roller to counterclockwise 180°. (refer to Fig. 1)
NG ±1/4 shift Entrance side Normal Exit side NG ±1/4 shift
Turn to 180° T roller
Fig. 1
2) Check of V/SR envelope wave form <Method and description> (1) Confirm that the envelope waveform peaks in V/SR mode are uniform. (2) If they are not uniform, fine-adjust the guide roller and the Tu guide. 3) Check of tape wrinkles <Method and description> (1) Check that the tape is not distorted between the Tu guide and pinch in the PB mode and the V/SR mode. -If crease is found, make an adjustment in the range of ±180°. -After adjustment apply Screw Lock.
Pinch roller Deformation
Adjust so that A
�
�
B.
A
B
Wrinkles Tu guide
Deformation
4) Check the rising time of the envelope wave form <Method and description> (1) Check the rising time of the envelope when switching from V/SR mode to PB mode. (Within 5 sec) (2) Check the rising time of the envelope when switching from STOP mode to PB mode. (Within 5 sec)
7-5. Final running adjustment
(With cassette controller) 1) Adjustment of Sup and Tu guide roller height <Method and description> (1) Perform ± 1/4 shift, then if the envelope wave's ratio of MAX. to MIN. are 60% or less, adjust again the height of guide roller. (Refer to Fig. 2) (2) Finally adjust the lock screw of Sup and Tu guide roller. (3) Once perform unloading and then loading to set the PB mode, and make sure that the envelope waveform does not change. 2) Adjustment of playback SWP <Method and description> (1) Playback the alignment tape for switch point adjustment. (2) Perform SWP automatic adjustment with adjustment remote control. * When replacing the mechanism and drum, adjust the phase and equalizer using the adjustment remote control. (Refer to "9. ADJUSTING THE ELECTRICAL CIRCUITS".)
Fig. 2
12
|
|
 |
> |
|