|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
This is exactly what I needed This was a hard one to find and I had already downloaded several for other Panasonic radios but none matched my radio.
Although my radio is the LBE model the LBS is the same.
A very good quality manual with every thing you should get in it
 ;
el manual es correcto , completo y de buena calidad aunque algun esquema esta excesivamente diseccionado.
 ;
muy buen manual con multiples graficos y formas de onda ademas de muy completo y bien presentado.
 ;
As Always these people were very rapid and efficient. A great job helping hobbiest and workers!!! Thank you a lot!
 ;
Excellent printing quality.
A complete and very usefull service manual with all details.
GREAT SERVICE AT VERY LOW PRICE!
A+++++++++++++++++++++++++
VL-NZ10S/H/E
8-3. How to operate with the circuit board without the cassette controller assembly.
In this method, if the procedure is followed incorrectly there is danger of damaging the mechanism and the tape, so except in special cases, such as when measuring the VSR torque, do not perform this procedure. Normally operate this unit with the cassette controller assembly attached. Be sure to follow each caution mentioned.
(1) Apply DC3 ~ 4V to the loading motor to enter the standby mode. (2) Securely press the movable piece L of the down SW with cellophane tape or similar to turn on SW. (Take care that the movable piece turns only in the shown arrow direction.) Note: To enter REC mode, press the pin of the recognition switch M . (Unnecessary in other modes.) (3) Set the test mode (T-01) with the adjustment remote controller without putting the tape, and the mechanical operation will become possible with the mode key. (4) For ejection, remove the tape of (2).
Side view Movable piece of down SW.
Rotary direction of movable piece
8-4. Phase matching
Fig. 7. LOADING START mode
Referring to Figs. 8 and 9, align the phase for the following parts. (1) Eject lever (2) Eject control lever (3) Mode SW (4) Main cam (5) Sub cam Note: Before disassembly, sufficiently check the marker position. Note: When installing the joining gears, verify that the phase matching holes of the main cam and subcam are aligned to the hole of the chassis. Note: After the phase is aligned, turn the mode SW with hand, and verify that it turns nearly one turn. (After verification, return it to the original position.)
Eject control lever Eject lever
Phase matching hole (for chassis) Phase matching hole (for gear) Mode switch Phase matching mark
Fig. 8
Main cam Phase matching hole (for chassis)
Coupling gear
Sub cam Phase matching hole (for chassis)
Fig. 9
15
|
|
 |
> |
|