|
Who's Online
There currently are 5689 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Ottima qualità grafica e completo nelle notizie. Costo abbastanza contenuto.
;
Great and quick support. The maual was exactly what I was looking for and my problem
solved. Many thanks.
;
Very good service Within one day i received a pdf of the users manual and electric circuits so I was able to measure the different voltages in the printed circuit and find out the fault Payment was also reliable and easy.Without the manual i could not have repaired.So thanks to "Search for a manual"
;
you are doing great job guys.....my father ask me to find out the schematics of Sony KV25R1D to sort out the problem ..(he was electrical technician, and excperianced with TV and simillar stuff). finally he found the cause and change all necessary parts....now he has got working old dog..and is very happy!!... thank you all.. NB..he also saved the repair cost.
;
Perfect. Received my manual within 24 hours. Clear scan of the manual I needed. No problem.
VL-NZ10S/H/E
8-3. How to operate with the circuit board without the cassette controller assembly.
In this method, if the procedure is followed incorrectly there is danger of damaging the mechanism and the tape, so except in special cases, such as when measuring the VSR torque, do not perform this procedure. Normally operate this unit with the cassette controller assembly attached. Be sure to follow each caution mentioned.
(1) Apply DC3 ~ 4V to the loading motor to enter the standby mode. (2) Securely press the movable piece L of the down SW with cellophane tape or similar to turn on SW. (Take care that the movable piece turns only in the shown arrow direction.) Note: To enter REC mode, press the pin of the recognition switch M . (Unnecessary in other modes.) (3) Set the test mode (T-01) with the adjustment remote controller without putting the tape, and the mechanical operation will become possible with the mode key. (4) For ejection, remove the tape of (2).
Side view Movable piece of down SW.
Rotary direction of movable piece
8-4. Phase matching
Fig. 7. LOADING START mode
Referring to Figs. 8 and 9, align the phase for the following parts. (1) Eject lever (2) Eject control lever (3) Mode SW (4) Main cam (5) Sub cam Note: Before disassembly, sufficiently check the marker position. Note: When installing the joining gears, verify that the phase matching holes of the main cam and subcam are aligned to the hole of the chassis. Note: After the phase is aligned, turn the mode SW with hand, and verify that it turns nearly one turn. (After verification, return it to the original position.)
Eject control lever Eject lever
Phase matching hole (for chassis) Phase matching hole (for gear) Mode switch Phase matching mark
Fig. 8
Main cam Phase matching hole (for chassis)
Coupling gear
Sub cam Phase matching hole (for chassis)
Fig. 9
15
|
|
|
> |
|