Shopping cart is empty
 
English Polski Spanish 
Search For a Manual
 

(e.g. AA-V20EG JVC, ZX-7 Sony )
PayPal 1000+ rating Secure, Encrypted Checkout.
 
Who's Online
There currently are 5812 guests online.
Categories
Information
Featured Product
Home >> SHARP >> VL-PD3S Service Manual
 
 0 item(s) in your cart 

SHARP VL-PD3S
Service Manual


Tweet about this product and get $1.00 of store credit for instant use!
  • Contains Circuit Diagrams
  • Download
  • PDF Format
  • Complete manual
  • Language: English
Price: $4.99

Description of SHARP VL-PD3S Service Manual

Complete service manual in digital format (PDF File). Service manuals usually contains circuit diagrams, printed circuit boards, repair tips, wiring diagrams, block diagrams and parts list. Service Manual ( sometimes called Repair Manual ) is used mainly by technicians.

If You just want to know how to use Your tv, video, mp3 player etc. You should look for Owner's Manual. After placing order we'll send You download instructions on Your email address.

The manual is available in languages: English

Not yet ready
You must purchase it first

Customer Reviews
There are currently no product reviews.
Other Reviews
 CCU-700AP VOLUME1 SONY Service Manual by Ralf Made;
Super Anleitung. Ordentliche Auflösung. Das ganze noch in Deutsch wäre zu schön. Alle Datenblätter sind sauber Kopiert und alle Leitungswege sind sauber ausgeführt
 PVW2650P VOLUME 1 SONY Service Manual by Artur Łukasik;
Thanks God for the internet and thanks for the service like this - proffessional solution on time.
 3681 ALPINE Service Manual by Luís Visentin;
About the service it's very fast and reliable. About the manual the quality is high enough to read even the tiniest details on the wiring diagrams so you can't ask much more than that, let it alone for a manual of a product from 20 years ago. Thank you, very satisfied.
 A-1200P SANSUI Service Manual by Brian Smith;
The downloaded quality was as good as the orignial
 GF8585HB SHARP Service Manual by Herbert de Groot;
This is a great and complete Service Manual for the Sharp GF8585HB. Giving full and detailed technical insight. Good to find these manuals online.

Text excerpt from page 12 (click to view)
VL-PD3S/H/E

VL-PD3S/H/E

7-4. Running rough adjustment
(Since this adjustment is performed without cassette controller, put a proper weight so that the cassette does not rise , and make an adjustment.) 1) Su, Tu guide roller height adjustment <Method and description> (1) Loosen the guide roller lock screw, then tighten loosely so that the roller turns easily. (2) Replay an alignment tape, and adjust the Su, Tu guide roller so that the envelope sides of entrance and exit are flat. (3) Perform ± 1/4 shift, then, as in the above case, adjust until the envelope becomes flat. * If running is difficult for the entrance changed, turn the T roller to counter clockwise 180°. (refer to Fig. 1)
NG ±1/4 shift Entrance side Normal Exit side NG ±1/4 shift

Turn to 180° T roller

Fig. 1

2) Check of V/SR envelope wave form <Method and description> (1) Confirm that the envelope waveform peaks in V/SR mode are uniform. (2) If they are not uniform, fine-adjust the guide roller and the Tu guide. 3) Check of tape wrinkles <Method and description> (1) Check that the tape is not distorted between the Tu guide and pinch in the PB mode and the V/SR mode. -If crease is found, make an adjustment in the range of ±180°. -After adjustment apply Screw Lock.
Pinch roller

Adjust so that A
A

�

�

B.

B
Wrinkles Tu guide

Deformation

Deformation

4) Check the rising time of the envelope wave form <Method and description> (1) Check the rising time of the envelope when switching from V/SR mode to PB mode. (Within 5 sec) (2) Check the rising time of the envelope when switching from STOP mode to PB mode. (Within 5 sec)

7-5. Final running adjustment
(Perform adjustment without removing the cassette controller.) 1) Adjustment of Sup and Tu guide roller height <Method and description> (1) Perform ± 1/4 shift, then if thire envelope wave's ratio of MAX. to MIN. are 60% or less, adjust again the height of guide roller. (Refer to Fig. 2) (2) Finally adjust the lock screw of Sup and Tu guide roller. (3) Once perform unloading and then loading to set the PB mode, and make sure that the envelope waveform does not change. 2) Adjustment of playback SWP <Method and description> (1) Playback the alignment tape for switch point adjustment. (2) Perform SWP automatic adjustment with adjustment remote control.

Fig. 2

7-2

You might also want to buy

$4.99

VL-PD3S SHARP
Owner's Manual

Complete owner's manual in digital format. The manual will be available for download as PDF file aft…
>
Parse Time: 0.902 - Number of Queries: 108 - Query Time: 0.408