|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
This manual is a complete guide, including later additions. It has all the necessary information about the replacement items. The material quality is great to read.
 ;
This manual is very helpful, correct shematic diagram, and good exploded view.Perfect!
 ;
Alte gescannte Servicepläne sind oft doch etwas undeutlich . Stromlaufpläne werden auf mehrere DIN A4 Seiten aufgeteilt. Alles ziemlich umständlich und zeitaufwendig. Aber mit etwas Mühe geht alles.
 ;
Great item, high resolution, detailed, very easy to work with.
 ;
fast delevery of the manual and very complete manual, now my Akai works again, will buy again, thanks.
VL-Z1S/X/E VL-Z1H/R
8-7. Method of taking out the cassette with the mechanism operating singly
(1) Apply 3 to 4V DC to the loading motor for slight unloading. (2) If the tape is slack, turn the rotor (mechanism backside) of the capstan motor by hand to take up the slack in the tape. (3) Repeat steps (1) and (2) above. When the pole base is completely unloaded, check that the tape is not slack. (4) Then apply 3 to 4V DC to the loading motor again. The cassette controller will move up. (5) Take out the cassette. Note) When applying 3 to 4V DC to the loading motor for unloading, do so as shown in Fig.1.
Direction of rotation of the rotor of the capstan motor (from mechanism backside) Loading motor
+ pole
� pole
Fig.1
24
|
|
 |
> |
|