|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Great job supplying the manual.
Many of these products weerepretty obscure, so it was great that you had
the manual for it!
 ;
Great manual, would not have been able to operate my machine without it!!
James Dawson August 18, 2012
 ;
excellent value & price! Includes everything you need to know about the NN-C777! I would buy this again.
 ;
Very satisfied! I was searching for several days, but nope; till I discovered your webside and there it was at a very reasonable price. Keep up the good work!
Paul
Flanders
 ;
Generally speaking good copy; a few pages too hard contrast...
Good service and communication.
Installation
Recommendations
� Carefully choose the mounting location so that the unit won�t interfere with normal driving. � Avoid mounting locations where the unit would be subject to high temperatures, such as from direct sunlight or hot air from the heater, or where it would subject to dust, dirt or excessive vibration. � The illustration below shows a typical installation, however, you may need to adjust the installation, depending on the unit. If you have questions or need additional installation hardware, consult your Blaupunkt dealer. � Make sure the unit is firmly anchored (preferably at both front and back) and does not vibrate.
Mounting Hardware
(1) Sleeve
(2) Mounting Strap and Screw
(3) Release Keys
Mounting The Unit in Most Dashboards
1 Install the Sleeve (1) in the dashboard. 2 Select and bend the appropriate tabs to hold the sleeve firmly in place. 3 A. Attach the Mounting Strap (2) to the underside of the dashboard, using screw. B. Attach the back of the unit to the mounting strap using the support stem bolt and hardware.
Bend these tabs
Dashboard
8
|
|
 |
> |
|