|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Good quality instructions manual. Very useful to me. Quick and excellent service from Owner-Manuals... Thanks !!!
 ;
Sono molto soddisfatto e, quando mi necessiterà, mi avvarrò nuovamente di questo servizio!
 ;
A comprehensive Operating and Service Manual. All schematics are complete and easy to read. The PCB drawings and complete parts list are very helpful. I would definitely recommend this manual.
 ;
SCANNING OF HIGH QUALITY
VERY, VERY HIGH VELOCITY DOWNLOAD
VERY GOOD PRICE,
TRUE SATISFIED, THANKS
 ;
Genuine Toshiba owner's manual. Couldn't really ask for more. And written in understandable English in contrast to a few recent experiences I have had with manuals for other equipment other than Toshiba but made in China and written in "Chinglish"!
Calibration Procedure for the BBE 482
(REV/S/ON 1.1)
NOTE: THIS UNIT WAS TESTED AND CALIBRATED AT THE FACTORY. THIS PROCEDURE IS FOR QUALIFIED PERSONNEL ONLY. INITIAL SETTINGS: 1. BBE Process controls VR1 and VR3 to minimum.(C.C.W.) 2. Lo Contour controls VR2 and VR4 to minimum.(C.C.W.) 3. Power switch �ON� and BBE function switch �IN�. POWER SUPPLY TEST: 1. With DVM set to DC volts, measure the positive end of C27. You should read less than +30vdc. 2. With DVM set to DC volts, measure the negative end of C29. You should read less than -30vdc. 3. With DVM set to DC volts, measure the voltage on JMP5. Reading should be +15vdc, (+/-0.5vdc). 4. With DVM set to DC volts, measure the voltage on JMP4. Reading should be -15vdc, (+/-0.5vdc). BBE PROCESS TEST: 1. Input a 5khz signal @ -l0dBu into channel A [B] input. 2. With DVM set to AC volts, measure the channel A [B] output. 3. With Process control at minimum (C.C.W.) DVM should read -11.5dBu (+/-1dBu). 4. With Process control at maximum (C.W.) DVM should read +2dBu (+/-1dBu). LO CONTOUR TEST: 1. Input a 50hz signal @ -l0dBu into channel A [B] input. 2. With DVM set to AC volts, measure the channel A [B] output. 3. With Lo Contour control at minimum (C.C.W.) DVM should read -11dBu (+/-1dBu). 4. With Lo Contour control at maximum (C.W.) DVM should read +3dBu (+/-1dBu). BYPASS TEST: 1. Input a 500hz signal @ -l0dBu into channel A [B] input. 2. With DVM set to AC volts, measure the channel A [B] output. 3. With the process �IN�, DVM should read -9dBu (+/-1dBu) and the Process �IN� LED should be on. 4. With the Process �OUT�, DVM should read -11dBu (+/-1dBu) and the Process �OUT� LED should be on. LED TEST: 1. Input a 5khz signal @ -20dBu into the channel A [B] input. The yellow -20 LED should light. 2. Change input level to -l0dBu. The yellow -12dBu LED should light. 3. Change input level to -5dBu. The green -6dBu LED should light. 4. Change input level to 0dBu. The green 0 LED should light. 5. Change input level to +18dBu. The red clip LED should light. END TEST.
5381 Production Drive Huntington Beach, CA 92649 (714) 897-6766
11
|
|
 |
> |
|